Skip to main content

Free Tool

Concrete Calculator

Work out how much concrete a slab, column, beam or footing needs — plus the cement, sand and aggregate behind it.

Your figures

A 150 mm slab is 0.15 m.

Result

Concrete required
3.78 m³

3.60 m³ net plus 5% wastage.

Cement
31 bags (50 kg)
Sand
1.59 m³
Aggregate
3.18 m³
Ready-mix trucks
1 × 6 m³

Most Dubai suppliers deliver in 6 m³ loads.

About this calculator

Order too little concrete and you get a cold joint. Order too much and you pay for what goes back on the truck. This works out the volume for the four shapes that cover most of what gets poured on a villa site.

It also breaks the volume down into cement bags, sand and aggregate using a standard nominal mix, which is useful when you are batching on site rather than ordering ready-mix.

What it assumes

  • Volumes are for plain concrete — reinforcement steel is calculated separately.
  • Material quantities use a dry-volume factor of 1.54 and a 50 kg cement bag.
  • Ready-mix suppliers usually have a minimum load; check before ordering small pours.

FAQ

Frequently Asked Questions

On a villa, M20 covers most slabs and footings and M25 is common for columns and beams. Your structural drawings will specify the grade — follow them rather than this list.

Let's Live With Comfort

Want the real number, not an estimate?

Send us the plot details or drawings and we will come back with a proper cost and programme.